After the Fact
An after-the-fact application concerns work carried out before the required approval was obtained. The reviewing authority determines the documents, inspections and corrections needed.
Detail
About After the Fact
Existing-condition drawings can support the application, but recording completed work does not automatically approve or legalize it.
FLORIDA PERMIT DATA
In the records
"after the fact" appears in 3,240 matching permits in the Florida records we analyzed.
Counts are not additive: a permit can match more than one term. Adding category counts can count the same permit more than once.